|
Conduct a
specific need analysis explicitly based on the results of
WasteSafe to obtain clear data about the sources, amounts,
characteristics and properties of the waste streams to be
disposed of and the way how to dispose them.
Select an
integrated waste management approach based on WasteSafe
considering waste system components such as contain &
collect, sort & recover, transfer & treat and dispose
& make safe, and aspects of evaluation such as source
& streams, costs & returns, health & environment
and community & structure, then practical action of the
approach and evaluation.
Develop a WMMP of MSW for the main case study city,
Khulna, based on the reality check results of WasteSafe
approach. Aspects related to storage, collection, assembly,
transport, and disposal, including composting, treatment and
landfill, would be addressed elaborately.
Drawing and elaborating sketches of various important
aspects of waste management for Dhaka, Chittagong, Rajshahi,
Barisal and Sylhet through workshops, seminar, discussion and
training under the supervision of experts.
Study the usability of local building materials for
landfill construction by sampling and analysing selected
potentially suitable materials (natural resources such as clays and clayed
soils) and testing them in lysimeter
set-ups.
Study on the acceptable composting technology based on
the waste streams, local condition, socio-economic setting,
available technologies, market facilities and other associated
aspects.
Demo projects on composting plant and landfill
cell.
Demonstrate the composting technology, modern
landfill standards by the planning, design, construction and
operation of a pilot-scale engineered landfill cell at
specified local conditions and by testing various locally
available facilities a materials.
Study the
special problems arising from the need to construct landfills
in low-lying areas with a high groundwater level and a high
risk to flooding, and even in wetlands, by wetland cell tests
and propose technical solutions.
Assessment
will be conducted on the employed storage, primary collection,
transfer station, secondary collection, transfer, composting,
recycled and sanitary landfill technique.
Finalisation of WMMP and appropriate technical
guidelines for all tiers of MSW management based on the
inherent conditions of LDACs to support the achievement of a
safe and sustainable MSW management.
|